EE, DSM and RE Program developed a portfolio of energy
efficiency and renewable energy pilot projects implemented
by local Energy Service Companies. Projects are distributed
through five energy demand sectors: municipal-governmental,
residential, commercial, industrial and agricultural.
Pilot projects provide empirical data for assessing the
feasibility of various energy efficiency and renewable
energy alternatives in Armenia.
Over this period, the program has sponsored the implementation
of 49 technical pilot projects. Below is the list of
technical projects by energy demand sectors with activities
to be accomplished.
COMPLETED
PROJECTS |
|
Municipal/Governmental
Projects |
|
Site |
Subcontractor |
Measures |
End Date |
| 48 Fire Stations of The
RA State Rescue Service |
Thermoservice
Ltd.
Artstrom OJSC |
Mounting
of pressure regulating control points and low pressure
gas supply pipelines to the fire-stations
Installation
of gas room heaters in shift rooms
Installation
of high efficiency combat compact tubular unit
heaters in the garages
Insulation
of gates of the garages with glass cotton |
April 2006 |
| Municipal Street Lighting
in Nor-Nork Community of Yerevan |
Artstrom OJSC |
Installation
of the “Dispatcher” control system in the central
control point
Redesign
of several branches of the street lighting network
including 19 streets with a total length of 37,560
meters |
October
2006 |
| RA
Tax Inspection Building, Yerevan |
Thermoservice
LLC |
Installation
of high efficiency gas boilers for space heating.
Renovation
of the internal heating system with mounting of
new radiators and regulative valves |
June
2006 |
| Wrestling
Olympic Youth Sports School, Yerevan |
Contact-A
LLC |
Installation
of a solar water heating system with a back up
of electricity |
April
2006 |
| Kindergarten
# 47, Yerevan |
CESCO |
Construction
of local gas boiler house
Renovation
of the internal heating system and installation
of new radiators with TRVs
Replacement
of old windows and doors with energy efficient
ones
Construction
of a gas supply line to the boiler
house, a gas pressure control unit
and a gas meter center |
February
2006 |
| Maternity
and Child Care Research Center, Yerevan |
Anergo
Two |
Construction
of local heating system |
January
2006 |
Rest
House of the
Union of Armenian Artists, Tsakhkadzor
|
Artstrom |
Installation
of energy efficient windows and doors and insulation
of roof with glass cotton
Construction
of a gas boiler house and setting of four water heaters
Mounting
of low pressure gas supply pipeline to the boilers
and water heaters
Renovation
of internal heating and hot water supply systems
Installation
of regulative valves |
December
2005 |
| Polyclinic
#4, Vanadzor |
EIICG |
Reconstruction
of the local boiler house
Construction
of internal/external energy efficient heating systems
Installation
of cast iron radiators equipped with regulating valves
Mounting
of gas supply pipeline |
December
2005 |
| Physics
Institute, Yerevan |
Technokom |
Repairing,
glazing and weatherization of windows and external
doors
Construction
of boiler house and renovation of internal heating
system |
December
2005 |
| Arabkir
Joint Medical Center –Institute of Child
and Adolescent Health, Yerevan |
Technokom |
Repairing,
glazing and weatherization of windows and external
doors
Construction
of gas-fired boiler house and renovation of internal
heating system
Installation
of solar water heating system with the gas
and electricity back-up |
November
2005 |
| Red
Cross Rehabilitation Center, Yerevan –Ashtarak |
Elektroshinarar |
Replacement
of transformers
Installation
of automatic drive cells |
September
2005
|
| Sevan
Town Hospital, Gegharkunik marz |
|
Repairing,
glazing and weatherization of windows and external
doors.
Construction
of local gas-fired heating system |
August
2005
|
| Orphanage
in Gavar, Gegharkunik marz |
|
Repairing
and weatherization of existing windows and doors
Gas
boiler design and full reconstruction |
July
2005
|
| Local
Heating System Installation at Yerevan Polyclinic
#8 |