NEW
PROJECTS |
|
Site |
Subcontractor |
Measures |
Start Date |
| Local Gas-Fired Heating System Installation at Ganyan Secondary School |
Thermoservice LLC |
Installation of eight boilers with the total capacity of 280 kW
Construction of internal heating system
Installation of regulative valves
Construction of gas supply line from the nearest gas supply pipeline
|
May 2010 |
| Windows Replacement and Local Gas-Fired Heating System Installation Project at Byureghavan Town Polyclinic |
Thermoservice LLC |
Replacement of windows and external doors with modern energy efficient ones
Installation of three high efficient “Eurotherm” gas-fired boilers with the total capacity of 105 kW
Construction of the gas supply pipeline
Renovation of the internal heating system
Installation of regulative valves
|
June 2010 |
| Gas-Fired Space and Water Heating System Installation at the Health Care Center in Amasia village |
Thermoservice LLC |
Installation of two double-circuit boilers, with 35 kW capacity each, for space and water heating.
Construction of internal space and water heating systems
Installation of regulative valves
Construction of gas supply line from the nearest gas supply pipeline
|
January 2010 |
| Local Heating System Installation at Children’s Summer Camp in Tsaghkadzor |
Technokom LLC |
Construction of low pressure gas supply pipeline to the boiler house (300 m.)
Installation of high efficient gas – fired boilers with total capacity of 700 kW for space and water heating purposes.
|
December 2009 |
| Local Gas-Fired Heating System Rehabilitation at the School #3 in Sarukhan village |
Technokom LLC |
Renovation of the boiler house
Installation of two high efficient gas – fired boilers with total capacity of 550 kW for space heating.
Construction of heat supply line from the boiler house to the school building
|
October 2009 |
| Combined Gas and Solar Water Heating System Installation at “Aregak” Day Care Center, Gyumri |
Thermoservice LLC |
Installation of a solar water heating system
Installation of Euroterm gas – fired boilers with total capacity of 60 kW for space and water heating
Renovation of whole internal heating system
|
July 2009 |
| Solar Water Heating System Installation at Children’s Summer Camp, Tsaghkadzor |
Technokom LLC |
Installation of a solar water heating system with back up of electricity, including 120 m2 of flat plate solar collectors, four 1/2 tons storage tanks and system control components |
July 2009 |
| Combined Gas and Solar Water Heating System Installation at the Social Assistance Center, Gyumri |
Technokom LLC |
Installation of a solar water heating system
Mounting of low pressure gas supply pipeline to the boiler house
Installation of a high efficient gas – fired boilers with total capacity of 500 kW for space and water heating
Renovation of whole internal heating system |
April 2009 |
| Local Heating System Installation at the Kindergarten #12 |
Artstrom CJSC |
Construction of gas supply pipeline from the main line to the boiler house
Installation of double circuit boilers
Renovation of internal heating system including cast iron radiators
Installation of regulative valves
|
July 2008 |
| Local Heating System Installation at the Children’s Orthopedic Hospital in Masis |
CESCO Ltd. |
Construction of low pressure gas supply pipeline
Installation of locally manufactured double circuit gas-fired boilers
Renovation of the internal heating system including radiators
Installation of regulative valves
|
July 2008 |
| Local Heating System Installation at the Maternity Hospital of the Kanaker-Zeytun Medical Center |
Thermoservice LLC |
Construction of low pressure gas supply pipeline
Installation of double circuit gas-fired boilers for space and water heating
Renovation of the internal heating system including radiators
Installation of regulative valves
|
July 2008 |
| Solar water heating system installation at Berlin polyclinics |
Technokom LLC |
Installation of solar collectors for water heating |
August 2008 |
| Local Heating System Installation at the Yerevan Medical Emergency Service |
Technokom LLC |
Construction of low pressure gas supply pipeline
Installation of high efficiency gas fired boilers
Renovation of the internal heating system including radiators
Installation of regulative valves
|
August 2008 |
| Local Heating System Installation at the Medical Center of Dermatology and STI |
Thermoservice LLC |
Construction of low pressure gas supply pipeline
Installation of high efficiency gas fired boilers
Renovation of the internal heating system including radiators
Installation of regulative valves
|
August 2008 |
| Local Gas-Fired Heating System Installation Project at the Art School of Mkhitar Sebastatsi Educational Center |
Thermoservice LLC |
Construction of low pressure gas supply pipeline from the main line to the boiler house (320 m.)
Installation of efficient gas – fired boilers
Renovation of internal heating system including cast iron radiators
Installation of regulative valves |
December 2007 |
| Local Heating System Installation at Sevan Kidnergarten #2 |
CESCO Ltd. |
Construction of low pressure gas supply pipeline from the main line to the boiler house (80 m.)
Installation of efficient gas – fired boilers with total capacity of 176 kW (88+88)
Renovation of internal heating system including cast iron radiators
Installation of regulative valves |
November
2007 |
| Local Heating System Installation at Kofoed Foundation’s Educational Center |
Artstrom CJSC |
Construction of low pressure gas supply pipeline from the main line to the boiler house (80 m)
Installation of efficient gas – fired boilers with total capacity of 400 kW (200+200), for space and water heating
Renovation of internal heating system including cast iron radiators (2160 sections)
Installation of regulative valves |
October
2007 |
| Local Heating System Rehabilitation at the Center of Family Planning and Reproductive Health in Yerevan |
Thermoservice LLC |
Renovation of the internal and external heating system including cast iron radiators
Construction of the boiler house including installation of a boiler and supplementary equipment
Hot water supply
|
September 2007 |
| Local Heating System Rehabilitation at the Third Clinical Hospital in Yerevan |
Technokom LLC |
Renovation of the internal and external heating system including cast iron radiators
Construction or renovation of the boiler house including installation of a boiler and supplementary equipment
|
September 2007 |
| Local Heating System Installation at the Kindergarten #7 |
EIICG LLC |
Renovation of the internal and external heating system including cast iron radiators
Construction or renovation of the boiler house including installation of a boiler and supplementary equipment
|
September 2007 |